Elementary School Projects
Many of the village schools are in desperate need of repairs. In 2022, with the help of West Bend Community Church (Wisconsin). CBM replaced 4 roofs, 2 on school buildings in Chunox and 2 in Concepcion. The schools were painted and the team from WBCC made numerous repairs. In 2023, CBM returned to Concepcion to replace 16 windows and 2 doors. The team brought down 35 study Bibles and led Bible studies with 3 schools, held a community Bible study, taught Bible stories in the schools, and more.